Skip Ribbon Commands Skip to main content

 Proposed LRT System Maps

The final Preliminary Design for the alignment (from south to north) begins on Hurontario Street at the Port Credit GO Station in Mississauga, then around Mississauga’s City Centre area, then north on Hurontario Street until Brampton’s downtown Main Street. The LRT line is proposed to have 26 stops on the 23 km corridor, including 3 stops within the Downtown Mississauga City Centre and 2 stops witihin Downtown Brampton.

Proposed Hurontario-Main LRT Route Alignment

HMLRT corridor mapR6_March2014.jpg